www.smallsailboats.co.uk

Paradox-uk.co.uk

 

 


Construction Gallery 2

Construction Gallery 1 Construction Gallery 3
Construction Gallery 4 Construction Gallery 5

Dry assembly.

Bow.

Stern.

Stern again.

Inside of transom.

 

Forepeak.

Stem close-up.

Wet assembly.

Vent trunk.

Fits in the garage.

Notches for sheer clamp.

Ready for sheer clamps.

Bow view.

Sheer clamps.

Sheer clamps again.

Fixing starboard chine log.

Bow chine log.

Stern chine log.

Planed chine logs.

Planed chine logs again.

Divisions.

Chine Runner.

Lower Gudgeon.

Bottom finished.

Ready for the Interior.
Construction Gallery 1 Construction Gallery 3
Construction Gallery 4 Construction Gallery 5

Copyright 2007 Small Sailboats.

Site URL: http://www.smallsailboats.co.uk